Nemaha County Jail Addition

Features: 15,000 sqft addition Added 15 cells, 34 beds 5 security pods Structural Fabricator: Snyder Engineering, Inc. Miscellaneous Fabricator: Snyder Engineering, Inc. Structural Detailer: Snyder Engineering, Inc. Miscellaneous Detailer: Snyder Engineering, Inc. Architect: Treanor Architects Engineer of Record: Bob D. Campbell Type of Construction: Government

New Southwest Elementary

Features: 90,000 sqft 3-acre project on NW corner of Scott Blvd and Hwy KK Opens August 2016 Construction cost of $16 million Structural Fabricator: Snyder Engineering, Inc. Miscellaneous Fabricator: Snyder Engineering, Inc. Structural Detailer: Snyder Engineering, Inc. Miscellaneous Detailer: Snyder Engineering, Inc. Architect: PW Architects, Inc. Engineer of Record: THH Inc. Type of Construction: Government

MU Jesse Hall Renovation

  Structural Fabricator: Snyder Engineering, Inc. Miscellaneous Fabricator: Snyder Engineering, Inc. Structural Detailer: Snyder Engineering, Inc. Miscellaneous Detailer: Snyder Engineering, Inc. Architect: Cunningham and Type of Construction: Government

MU Swallow Hall

Structural Fabricator: Snyder Engineering, Inc. Miscellaneous Fabricator: Snyder Engineering, Inc. Structural Detailer: Snyder Engineering, Inc. Miscellaneous Detailer: Snyder Engineering, Inc. Architect: International Architects Atelier Engineer of Record: Structural Engineering Associates Type of Construction: Government

Plaza 900 – University of Missouri

Features:

  • Two Separate Areas (East & West)
  • Multi-Level construction project, requiring advanced sequencing for staging materials on site

UMHC Patient Care Tower

Features:

  • 7-story structure with 315,000 SQ. FT.
  • $203,000,000 PROJECT
  • 6 OPERATING ROOMS
  • 30 PRE&POST PROCEDURE ROOMS
  • 90 PRIVATE PATIENT ROOMS

Hudson, Gillett, Rollins Renovation

Features:

  • Monumental stair designed, detailed, and fabricated by Snyder Engineering
  • Custom railing system designed specifically for this project
  • Additional structure added that was coordinated with the existing structure
  • Field measurments provided by Snyder Engineering

Central Methodist College

Features:

  • Circular stair detailed by Snyder Engineering
  • Snyder Engineering also provided field dimensions as part of detailing package
  • Detailing package included exterior railing systems (rolled and pitched)

Henderson Executive Airport

Features:

  • Terminal building opened on June 13, 2006
  • New stand-alone air traffic control tower
  • 95 new private aircraft storage hangars have also been placed into service