View Projects By Category
- Experience in: Education / Government
- Completed in: Columbia, MO
- Services Rendered: Structural and Miscellaneous Fabrication
Features:
- Two Separate Areas (East & West)
- Multi-Level construction project, requiring advanced sequencing for staging materials on site
- Experience in: Healthcare, Education
- Completed in: Columbia, MO
- Services Rendered: Fabrication and Detailing
Features:
- 7-story structure with 315,000 SQ. FT.
- $203,000,000 PROJECT
- 6 OPERATING ROOMS
- 30 PRE&POST PROCEDURE ROOMS
- 90 PRIVATE PATIENT ROOMS
- Experience in: Healthcare, Education
- Completed in: St. Louis, MO
- Services Rendered: Miscellaneous Detailing & Fabrication
Features:
- 11-story structure
- OVER 7,400 TONS OF STEEL TOTAL
- $206,000,000 PROJECT
- LEED GOLD CERTIFICATION
- 675,500 SQ. FT
- Experience in: Education
- Completed in: Amarillo, Texas
- Services Rendered: Steel Detailing
Features:
- Sloped architectural circular roof
- Project connection design provided by Snyder Engineering
- Roof required coordination of multiple trades
- Detailed using SDS/2 detailing software
- Experience in: Education
- Completed in: Las Vegas, NV
- Services Rendered: Detailing and Fabrication
Features:
- 4-story structure
- 205,779 SQ. FT.
- Academic offices, administrative offices, classrooms, research facility
- Experience in: Education
- Completed in: Fayette, MO
- Services Rendered: Structural and Miscellaneous Detailing
Features:
- Circular stair detailed by Snyder Engineering
- Snyder Engineering also provided field dimensions as part of detailing package
- Detailing package included exterior railing systems (rolled and pitched)
- Experience in: Education
- Completed in: Columbia, MO
- Services Rendered: Structural and Miscellaneous Detailing
Features:
- Architectural railing system at lobby and second level
- Project includes milti-rail egress stair railing
- Railing systems included cable, stainless steel, wood, and carbon steel.
- Experience in: Education, Sporting
- Completed in: Columbia, MO
- Services Rendered: Steel Detailing
Features:
- Snyder Engineering designed stairs, rails, and structural connections
- Entire project detailed by Snyder Engineering
- Prior to the start of the 1999 football season, construction of a new press box and luxury suites began
- The $13.1 million 15-story tower was completed in August 2000
- state-of-the-art facilities for the coaches and media
- Several executive suites, hundreds of premium club seats and a restaurant