Location:

Columbia, MO

Features:

  • Snyder Engineering designed stairs, rails, and structural connections
  • Entire project detailed by Snyder Engineering
  • Prior to the start of the 1999 football season, construction of a new press box and luxury suites began
  • The $13.1 million 15-story tower was completed in August 2000
  • state-of-the-art facilities for the coaches and media
  • Several executive suites, hundreds of premium club seats and a restaurant

Structural Fabricator: Apex Steel
Miscellaneous Fabricator: Apex Steel
Structural Detailer: Snyder Engineering, Inc.
Miscellaneous Detailer: Snyder Engineering, Inc.

Type of Construction: Education, Sporting